Emanuel was appointed by Minotti Kitchens to carry out the complete refurbishment of a former bank on Eastcastle Street, turning the ground floor and basement into a high-end kitchen showroom.
We took the project from the initial strip-out right through to completion — all building works, plumbing, electrical installation, painting and decorating, flooring, lighting and the kitchen installation itself. One contractor, start to finish.
The ground floor went first. The existing bank interior was stripped back and completely reconfigured to create a modern showroom suitable for displaying luxury kitchens — which means getting the shell, the services and above all the lighting right before a single unit arrives.
Our works included the installation and alteration of electrical systems, specialist showroom lighting, plumbing and associated services, wall and ceiling works, plastering, painting and decorating, flooring and final finishing.





Strip-out, steelwork and the shell being prepared across both floors
With the ground floor complete, we were instructed to refurbish the basement as a second phase — further strip-out and alterations, electrical and plumbing works, ceiling and wall construction, flooring, decorating and preparation for the additional kitchen installations and displays below.



The basement, from strip-out through to the finished display bays
Scope of works
- Full strip out and demolition
- Ground floor refurbishment
- Basement refurbishment
- Plumbing installations
- Electrical installations
- Specialist and feature lighting
- Bespoke illuminated feature columns
- Wall and ceiling construction
- Plastering and making good
- Painting and decorating
- Flooring
- Kitchen installation
- Bespoke finishing and detailing
- Final fit out and finishing works
Display bays with integrated lighting, stone and timber — the reason the lighting design came first
The result
A complete refurbishment package that took the building from an old bank, through demolition and construction, to a fully finished contemporary showroom across two floors — delivered in two phases without the client ever needing a second contractor.