A full renovation is not a big version of a small job. It is a sequencing problem: structure, then services, then finishes, with a dozen decisions that have to be made before the trade that needs them arrives. That is the part we are actually selling.
Where whole-house jobs go wrong
- Starting the finishes before the structure and the services are settled, which means opening things up again.
- Decisions taken late. Stone, glazing and joinery have lead times; a kitchen chosen in week ten holds up week four's plumbing.
- No single point of responsibility, so every defect becomes a discussion about whose trade caused it.


Whole properties, taken back and put together again
What's included in a renovation job
Our team handle the whole of it, so there's no second company to chase and no gap between trades for something to fall through.
- Strip out and demolition
- Structural alterations and steels
- Full rewire and replumb
- Heating and hot water
- Damp and waterproofing where needed
- Plastering and making good
- Kitchens and bathrooms
- Flooring and tiling
- Bespoke joinery and fitted storage
- Decoration throughout
- Lighting design and second fix
- Snagging, certification and handover
















